Long term testing of DWHR prototype nr 3
Testing of prototype #3 is now in its 45th week. We have been tracking cold water temperatures at the in- and output of the unit, as well as temperature difference of the drain water. From these temperatures, the performance of the heat exchanger can be calculated. We have noticed a decrease of performance over time. […]
Long term testing of DWHR prototype nr 3 Read More »